5S SIM1
Last updated
Last updated
In the section SIM1 Questions Configuration - by Line
Select 5s checklist.
Select Production Area, Line/cell Group, Date, Shift.
DLMO creates the list of questions defined in configuration, for the line if a Shop Floor checklist (example in figure), or for the department if an Office Checklist:
Pictures are shown according to the question sorting them. If more than one picture is associated with the same question, pictures are shown in alphabetical order.
For each question, is it possible to insert the result of the check (“OK” or “Not OK”), create an action, add a picture and add a comment.
Not compiled result is considered in the results evaluation as “Not OK”.
The selected results are highlighted in green (OK) and in red (Not OK).
SHOP FLOOR 5S RESULTS: Results are aggregated by shift for SIM1, by Production Area for SIM2 and by Plant for SIM3 -SIM5, with the following rules:
Result: is calculated as Number OK results / Number of questions (in %). Blank (not filled) checks are considered as not OK results.
Cell background color:
Gray: no checklist executed
Red : from 0% to 69%
Yellow : from 70% to 89%
Green : from 90% to 100%
*: means that there are checklists not started for at least one shift, regardless of the results.
First clicking on the date, DLMO shows the result (in %). With a second click on the date, DLMO opens the detailed page of the “not OK”results.
Switch “View all answers” to on to view all answers for the selected day.
Checklist is started pressing the button .
Results of executed checklists are shown in the “5S SIM1 Result” section, accessible by selecting the .
Clicking on the icon , it is possible to view actions, pictures and comments added in the execution.